Chiller Sysem
In Case of Cooling Water Failure
-
Go up to the roof
-
Move the Lever on the Power Box for the Chiller smartly down . Wait
one (1) minute , then move the lever smartly up again.
-
The chiller should start in 5 minutes.
Under Construction
Maintained by:
Thomas N. Massey
Office: Accelerator Lab 217
Telephone: (740)593-0933
E-Mail: MASSEY@OHIOU.EDU
Last modified on 11/5/98