Chiller Sysem

In Case of Cooling Water Failure

  1. Go up to the roof
  2. Move the Lever on the Power Box for the Chiller smartly down .  Wait one (1) minute , then move the lever smartly up again.
  3. The chiller should start in 5 minutes.

  4.  
Roof/Chiller Diagram
Under Construction
Under Construction
 
 
 
 
Maintained by:
Thomas N. Massey
Office: Accelerator Lab 217
Telephone: (740)593-0933
E-Mail: MASSEY@OHIOU.EDU
Last modified on 11/5/98